Scrub the acid into the floor and wait half an hour before rinsing it off with a hose.
Pouring a cap on a garage floor. The last step before pouring the garage floor is to check if it s level. Place the steel rods or rebar around the edges of the freshly poured concrete mix and through the middle of your floor if working with a large area. Concretefloor garagefloor howtopourconcretefloors in this video i m pouring a concrete floor for a new garage. We understand that for concrete that needs to look as good as it functions a concrete finish and seal is a great option.
The dimensions of the garage are 16 x 22. When we pour concrete floors over existing concrete floors and the new floor is less than 3 inches thick we use a product called weld crete to bond the two floors together. If the existing concrete except for the finish is in good shape structurally you can cap the existing concrete with 2 of 4000 psi concrete. Whether you re looking to give your home some added curb appeal or you want to create an eye catching showroom floor cap concrete coatings is your go to service professional.
It rolls or brushes on like paint very easy to install creates a bond between the old new concrete floors. The worst part is that when you are leveling a floor like this there will be thin and thick areas so you are not pouring a full 4 inch slab. Garage floors endure a lot of heavy use. Pour concrete etching acid over the surface and spread it with a shop broom.
Step 3 go over the surface with a wire brush to rough it up to help the new concrete adhere to the old. We used the concrete mixer to prepare the concrete. If the existing concrete is less than 4 thick cracking and breaking up you might be better off replacing it with a new concrete floor. Pour the resurfacing product onto the garage floor from the bucket.
When i pour and fin. These bars will provide strength to the concrete. Working the product back and forth across the floor with a long handled squeegee take care to cover all parts of the floor to a. We cap old rough concrete floors all the time.
Have the bars prepared before pouring. As you can see in the image the mixer sits along one side of the foundation so we can pour the concrete directly inside the formwork. Allowing the concrete to dry too much between pours will create layers and make the concrete weaker.